Rutenga-Beitbridge

The National Railways of Zimbabwe (NRZ) has suspended operations on its South East line after heavy rains washed away over 480 meters of rail. The Rutenga-Mbizi section lost 360 meters, while 120 meters were destroyed on the Rutenga-Beitbridge line due to overloaded drainage structures. NRZ noted the affected areas’ vulnerability to such incidents due to […]


Current track

Title

Artist